Fall 2010  
  Triple Crown Sports is a 10,000 S.F. Sport Facility in Denver, NC completed in the fall of 2010.  
  MORE>>
       
  Utilizing our design build capabilities, state of the art products and proven management techniques, we are confident you will receive the most value possible.  
       
 
Pre-Engineered Construction
Pre-engineered steel buildings
Mini-warehouses
Concrete Tilt-up Buildings
Bid projects
Construction Management
Construction scheduling
Permit acquisition
Professional on-site job supervision
 
       
 
Design-Build Services
Pre-Construction Design
Cost Budgeting/Evaluation
Preliminary building plans
Value engineering
Shell Buildings
Structured buildings with concrete slabs
Warehouse facilities, Garages, Utility storage
Retail centers for future tenant upfit
 
       
 
Turn-Key Construction
Complete Scope of required
construction services.
Site Evaluation/Design
Preliminary building locations
Preliminary parking
Loading docks and receiving
 
       
 
Interior Upfit/Remodel
Custom Interior Designs
Specialty floor and wallcoverings
Commercial/Office facility modernization
Conventional Construction
Structural wood construction
Conventional Steel construction
Built-Up roof systems
 
  Spring 2011  
  Pleasant Grove Missionary Baptist Church is a 12,000 S.F. Family Life Center located in Bowling Green, SC and was completed in the spring of 2011  
  MORE>>